Refine Your Search

Montevideo Uruguay 1944 stock footage and images

- Showing 6097 to 6102 of 6498 results
Buildings restructured by Seabees during the Allied invasion of Normandy, France in World War II.

A film about the role of U.S. Navy Seabees during the Allied invasion of Normandy, France in World War II. A German chart of Cherbourg harbor. Allied officers at a German hospital restructured by the 28th Battalion. A statue of Napoleon on a street. A naval headquarter building. Dr. Anderson of 81st Battalion with the first French baby delivered by him. The baby named 'Seabee' with his parents.

Date: 1944
Duration: 1 min 48 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077918
A sea mule tug pulls a vessel across the Atlantic Ocean during World War II.

A film titled 'Sea mule tug' about the importance of sea mule tugs in naval operations during World War II. Ships underway in the Atlantic Ocean. A sea mule tug comes alongside a vessel. Men aboard the tug. The sea mule tug pulls a vessel across the sea.

Date: 1944
Duration: 2 min 14 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077930
Men assemble a sea mule tug and work on its various parts in the United States.

A film about the importance of sea mule tugs in naval operations during World War II. Individual units of sea mule tugs being placed on a wooden scale by cranes in the United States. Units being unloaded. Individual units being treated with sealer to prevent corrosion. Jacks being used to bring together different parts. A tractor and a pontoon bridge being brought together and nuts being tightened. Different parts in a wooden crate after being assembled. A man climbs up a ladder into a sea mule tug. A technician works on the engine of the tug. Protective cover over the engine being removed. Fresh water cooler system being attached and tested.

Date: 1944
Duration: 3 min 48 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077931
Men assemble various parts of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. A control tower aboard the tug being placed on a tapping plate. Bolts being tightened at the base of the tower. The tapping plate being welded and bolts being removed. The control tower lifted off the tapping plate and replaced after welding the outer edge. A steering cable being made to pass through a steering cable shield. Men on the deck pull the cable. A steering chain being inserted and a man works on a cable guard. The steering chain and the cable being fastened together. A control column and another column being inserted. A lever being forced up the control column. Choke control lever being placed in position. A bolt being tightened. Choke control rod being connected to the choke control lever. Reverse control rod being connected to reverse control lever. Steering wheel being assembled. Hand rail being welded.

Date: 1944
Duration: 6 min 28 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077932
Men assemble the oil-air pressure gauge and the tachometer of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. The instrument panel of the tug being connected. An oil-air pressure gauge being assembled. A wire cable being guided down a control tower. A cable being fastened to a terminal block. A heat indicator tube being removed. A tachometer being assembled and a cable being plugged in.

Date: 1944
Duration: 2 min 43 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077933
Men assemble propellers of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. Propellers of the tug being connected and a nut being tightened. A wrench being used to tighten the nut. A fair water being placed to hold the propellers in place. A rudder shaft is lifted and a packing is placed on the rudder. A weller wheel placed into position. A steering cable passes around the wheel. The end of the cable being secured and a lock is fastened. A hull bumper being lifted and fastened. Engine oil level being checked. A 5C sea mule tug as men work on its deck. Central steering and central control towers on the deck.

Date: 1944
Duration: 5 min 19 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077934