Opening scene shows the Boghra diversion dam and associated irrigation canal built by Morrison-Knudsen Construction Company (MK) along the Helmand River in Afghanistan. Three MKA (Morrison-Knudsen-Afghanistan) engineers stand on the bank of the new irrigation canal of this project. Glimpse of a small power plant built on the canal. A man turns a large wheel releasing water from lateral canals into the main canal which would irrigate an experimental farming area. An MKA yellow truck,carrying three Afghans in the back, drives through an ancient gate to the headquarters for this experimental farm at an ancient caravan fortress named Nad-e Ali. Next, an Afghan is seen driving a tractor pulling a set of harrows to till the soil. A field where seed was planted. Scene shifts to later when the seeds have grown and an Afghan farmers are seen harvesting the new grain by hand. The next year, fields of alfalfa are seen from the first year's seeding. Another tractor is seen working at the edge of a field of crop. Afghan farmers use hand cultivators to tend the crops. View of large fields of crops. An Afghan boy stands on the bank of the Boghra canal. View of camels grazing in sparse desert area. Scene shifts to Afghan and MKA officials negotiating another contract. View of brass sign on the Export Import Bank in Washington, DC. Inside, officials of the Bank are seated around a table. (Narrator states the Bank provided a 22 million dollar loan for the new extended construction contract.) View of the Helmand River (and its deep canyon Northwest of Kandahar) and the Arghandab River, where large dams were to be constructed. Dump trucks are next seen commencing work at the Arghandab site, building a work road atop a dike along the side of the river. Camera pans across the broad sweep of the project underway. Construction equipment of all types seen moving along the work road and at work atop the dam. Afghan workers operating power shovels. Earth and stones moving on a conveyor belt. Wooden forms being built and steel reinforcing bars being installed. Afghans clearing areas for drilling operations. Afghan powder men ram charges into areas to be blasted. View of man pushing handle to ignite the charges. Explosion raises smoke, debris and dust. More views of construction equipment in operation Views of the dam at about the 200 foot height.
This historic stock footage available in HD video. View pricing below video player.
Type | Size | Price (USD) Comprehensive All Media License |
Price (USD) Digital-Only License |
---|---|---|---|
HD Master, Broadcast-ready (1920x1080, unmarked) | 4177 MB | $275.00 | $79.00 |
HD Screener (1920x1080, full-res with timecode) | 4177 MB | FREE or $4 (see below) | FREE or $4 (see below) |
Proxy (320x240, low-resolution, watermarked) | 67 MB | FREE or $4 (see below) | FREE or $4 (see below) |