A film about assembling of a sea mule tug in the United States. A control tower aboard the tug being placed on a tapping plate. Bolts being tightened at the base of the tower. The tapping plate being welded and bolts being removed. The control tower lifted off the tapping plate and replaced after welding the outer edge. A steering cable being made to pass through a steering cable shield. Men on the deck pull the cable. A steering chain being inserted and a man works on a cable guard. The steering chain and the cable being fastened together. A control column and another column being inserted. A lever being forced up the control column. Choke control lever being placed in position. A bolt being tightened. Choke control rod being connected to the choke control lever. Reverse control rod being connected to reverse control lever. Steering wheel being assembled. Hand rail being welded.
This historic stock footage available in HD video. View pricing below video player.
Type | Size | Price (USD) Comprehensive All Media License |
Price (USD) Digital-Only License |
---|---|---|---|
HD Master, Broadcast-ready (1920x1080, unmarked) | 5017 MB | $295.00 | $79.00 |
HD Screener (1920x1080, full-res with timecode) | 5017 MB | FREE or $4 (see below) | FREE or $4 (see below) |
Proxy (320x240, low-resolution, watermarked) | 81 MB | FREE or $4 (see below) | FREE or $4 (see below) |