Refine Your Search

Soviet Union 1958 stock footage and images

- Showing 2539 to 2544 of 2929 results
Construction of new buildings in New York City.

Men using huge machines to construct new buildings and demolish old ones in New York City. Men saw planks at the city harbor. Trucks at construction site. Man operates crane. An excavator digs and removes mud. A construction worker. Buildings in the city. Water at the site. Huge glass windows on a building. A crane lifts material. Hook on a crane. Reflection in glass windows. Worker welds, sparks fly. View of the city through the unfinished building. Building under construction. Man climbs up a support beam.

Date: 1958
Duration: 2 min 26 sec
Sound: No
Color: Color
Clip Type: Unedited
Language: None
Clip: 65675020869
Men using huge machines construct new buildings and demolish old ones in New York City.

Men using huge machines construct new buildings and demolish old ones. Rubble lying around as machines demolish a building. Men erect a fallen pillar. They pull down a structure. Burning of old material. A man tries to put out the fire. Demolition of old buildings. New buildings in the background. Pigeons on an old building. Buildings under construction. Cranes at the site. Smoke stacks in the background. Machines at the site.

Date: 1958
Duration: 1 min 28 sec
Sound: No
Color: Color
Clip Type: Unedited
Language: None
Clip: 65675020870
A small park and a shopping area in an American county seat.

A county seat in the United States. A statue on a tall pillar in a small park. The U.S. flag. Buildings in the town. Traffic near the round about. Pedestrians on the side walk. A shopping area, a drug store, a shoe store. A court house. FW Woolworth store. Pedestrians cross the road.

Date: 1958
Duration: 1 min 39 sec
Sound: No
Color: Color
Clip Type: Unedited
Language: None
Clip: 65675020871
Hydraulic, fuel and electrical system of a U.S. Navy T2V-1 SeaStar.

Aircraft system as well as normal and emergency operating procedures of the U.S. Navy T2V-1 SeaStar. A T2V-1 taxis on the airstrip. Hangars in the background. Wing span, fuselage length, height and gross weight of the plane. Diagrammatic representation of the plane's hydraulic system. The plane in flight as the landing gear opens up. Diagram of the plane's fuselage system. Total fuel load. The pilot turns on the tip tank fuel dump switch on the plane's control panel. Fuel dumped from the plane. Diagram of the plane's tanks. Diagrammatic representation of the plane's electrical system including the AC / DC systems. Diagram of the boundary layer control system.

Date: 1958
Duration: 4 min 20 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675020946
Pre-flight procedures including exterior and cockpit inspection of the U.S. Navy T2V-1 SeaStar.

Pre-flight procedures of the U.S. Navy T2V-1 SeaStar. Exterior inspection: Two airmen approach the plane to conduct a normal walk around inspection which includes highly important and unique inspection points. The airmen manually retract and extend the leading edge wing flap to check for freedom of movement. They inspect the ram air orifices in the nose of each tip tank, speed brake, fuel dump outlet, boundary layer control orifice, position of snubber piston, main hydraulic reservoir, and upper left fuselage. Interior inspection: The pilot in the cockpit. He inspects the engine, aircraft performance, navigation and fuel controls. He checks the electrical, navigational, air conditioning and lighting controls on the right panel and console. Pre-start Cockpit Check: The pilot adjusts the tip tank switches, oxygen supply valve, main fuel shut off switch, battery generator switch, flight instrument power switch, cabin pressure and temperature switches.

Date: 1958
Duration: 4 min 40 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675020947
Normal operating procedures including start, take off, stall and landing of the U.S. Navy T2V-1 SeaStar.

Normal operating procedures including start, take off, stall and landing of the U.S. Navy T2V-1 SeaStar. Start: The plane on the runway. A crewman arrives with the air impingement car. He inserts the pipe into the air impingement inlet. The crewman gives a signal when the air impingement hole is secure. The pilot adjusts the battery operator switch and turns on the ignition. He moves the throttle to ignite and then to idle position. The exhaust gas temperature gauge. The pilot signals the crewman to disconnect the air impingement starter and adjusts the instrument power switch. Post-start Cockpit Check: The pilot checks the RMI for alignment, adjusts S2 compass controller, annunciator panel touch button, fire detector test switch, fuel quantity indicator button. He checks the communication, navigational, annunciator and left panel. He goes through the take off check list, moves the plane into position, advances throttle, inspects the tachometer, exhaust temperature, releases brake and taxis to the end of the runway. The plane taxis, pilot applies brake and rudder control and takes off. He raises the nose wheel, retracts the landing gear and flaps after take off. The plane in flight over clouds. Stall occurs. The attack angle gauge. Landing procedure: View of the runway. The pilot begins the let down, reduces power, extends the brake, lowers landing gear and flaps, and continues to reduce speed. Diagram of the runway depicting approach. The plane approaches the runway, touches down and lands.

Date: 1958
Duration: 5 min 33 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675020948