Opening scene shows view from vehicle traveling from the Pakistan border over the Spinbaldak-Kandahar highway. View from above of a yellow truck on that road and arriving at the Morrison and Knudsen (MK) construction company headquarters near Kandahar. Views of the buildings to house and otherwise provide for MK employees. View of several camels walking away from the camera in a desert area. An MK crane lifts a drag line bucket in process of laying out a canal. An old man and a young boy watch the process. View of the MK-built dam across the Helmand River that will supply canals with water for irrigation. The King of Afghanistan, Mohammad Zahir Shah, arrives with aides to inspect the project. (Narrator notes the King was present at the gate-opening of the dam in 1949.) An MK engineer converses with the King. View of water flowing for the first time into a new canal. (The water approaches a man walking in the dry canal.) Engineers converse while standing above a canal construction site. Below, teams of Afghan workers work on the canal sides. An Afghan surveyor, using a transit, to lay out the center line for a canal, waves his arms to an assistant in the distance. Closeup of man driving a stake and another holding the line that will mark the center line. Earth moving equipment being used to prepare the canal bed. Closeup of machine wheels turning. Glimpse of freshly-dug long canal
This historic stock footage available in HD video. View pricing below video player.
Type | Size | Price (USD) Comprehensive All Media License |
Price (USD) Digital-Only License |
---|---|---|---|
HD Master, Broadcast-ready (1920x1080, unmarked) | 1500 MB | $190.00 | $79.00 |
HD Screener (1920x1080, full-res with timecode) | 1500 MB | FREE or $4 (see below) | FREE or $4 (see below) |
Proxy (320x240, low-resolution, watermarked) | 24 MB | FREE or $4 (see below) | FREE or $4 (see below) |