Refine Your Search

Adak Alaska USA 1943 stock footage and images

- Showing 12949 to 12954 of 27411 results
A PBM Mariner aircraft in flight and different parts that make up its design are pointed out in the United States.

A U.S. Navy training film about the role and importance of U.S. Navy PBM Mariner aircraft during World War II. A PBM Mariner takes off from the surface of a sea in the United States. The aircraft in flight. The design of a PBM Mariner III like the wings, tail and rudders forming a triangle being pointed out on a picture. The aircraft in flight. A side view of the Mariner shows the wings piled up on the top. The rudders being pointed out. The PBM Mariner in flight and different parts of the aircraft like the wings, rudders, engines and floats being pointed out.

Date: 1944
Duration: 6 min 38 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077866
Men assemble a sea mule tug and work on its various parts in the United States.

A film about the importance of sea mule tugs in naval operations during World War II. Individual units of sea mule tugs being placed on a wooden scale by cranes in the United States. Units being unloaded. Individual units being treated with sealer to prevent corrosion. Jacks being used to bring together different parts. A tractor and a pontoon bridge being brought together and nuts being tightened. Different parts in a wooden crate after being assembled. A man climbs up a ladder into a sea mule tug. A technician works on the engine of the tug. Protective cover over the engine being removed. Fresh water cooler system being attached and tested.

Date: 1944
Duration: 3 min 48 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077931
Men assemble various parts of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. A control tower aboard the tug being placed on a tapping plate. Bolts being tightened at the base of the tower. The tapping plate being welded and bolts being removed. The control tower lifted off the tapping plate and replaced after welding the outer edge. A steering cable being made to pass through a steering cable shield. Men on the deck pull the cable. A steering chain being inserted and a man works on a cable guard. The steering chain and the cable being fastened together. A control column and another column being inserted. A lever being forced up the control column. Choke control lever being placed in position. A bolt being tightened. Choke control rod being connected to the choke control lever. Reverse control rod being connected to reverse control lever. Steering wheel being assembled. Hand rail being welded.

Date: 1944
Duration: 6 min 28 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077932
Men assemble the oil-air pressure gauge and the tachometer of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. The instrument panel of the tug being connected. An oil-air pressure gauge being assembled. A wire cable being guided down a control tower. A cable being fastened to a terminal block. A heat indicator tube being removed. A tachometer being assembled and a cable being plugged in.

Date: 1944
Duration: 2 min 43 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077933
Men assemble propellers of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. Propellers of the tug being connected and a nut being tightened. A wrench being used to tighten the nut. A fair water being placed to hold the propellers in place. A rudder shaft is lifted and a packing is placed on the rudder. A weller wheel placed into position. A steering cable passes around the wheel. The end of the cable being secured and a lock is fastened. A hull bumper being lifted and fastened. Engine oil level being checked. A 5C sea mule tug as men work on its deck. Central steering and central control towers on the deck.

Date: 1944
Duration: 5 min 19 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077934
Men make final checks before the launching of a sea mule tug in the United States.

A film about assembling of a sea mule tug in the United States. A 5B sea mule being launched and it takes to water. Men attach a push bracket to the tug. Checks for gasoline leaks being made. The ignition button is pushed to start the engine. The tachometer being checked. The tug gets underway.

Date: 1944
Duration: 2 min 22 sec
Sound: Yes
Color: Monochrome
Clip Type: Edited
Language: English
Clip: 65675077935