1st Air Cavalry Dv. of Operation Delaware. CH-47 helicopter flying in with 105mm Howitzer hanging in sling. Howitzer is lowered to ground. Soldiers pushing the Howitzer across the hill for positioning. April 68. (Vietnam War period).
1st Air Cavalry Dv. of Operation Delaware. CH-47 helicopter flying in with load of supplies and dropping them to the ground. Major General John J Tolsin watching through binoculars and talking to the officer. MG John Tolsin boarding a helicopter and flying off. 24 April 1968.
1st Air Cavalry Dv. of Operation Delaware. General Willaim C. Westmorland discussing closely with some men. Gen. Westmoreland boarding the helicopter and leaving. 26 April 1968.
1st Air Cavalry Dv. of Operation Delaware. Soldiers standing near UH-1D helicopter and marching across the fields. 17 April 1968. (Vietnam War period).
A film titled 'First auto gyro mail lands on Post office roof' shows the Post Master General arriving at the Post office at Philadelphia in United States. Children carrying American flags march in a procession to celebrate the occasion. An auto gyro lands on the Post office roof as the Pilot delivers mails to Post Master General and flies back.
View from above of the U.S. Navy Gato class submarine Redfin, at the Philadelphia Navy Yard, where it is being converted to a radar picket boat. Workers stand above the hull, which has been cut in half. Next, the two halves of the hull are seen being moved apart to facilitate addition of a 34 foot extension in the hull between the control room and the forward batteries. View of derricks and cranes around the Redfin and of Workers standing atop the boat's hull. Camera pans to closeup of one half of the boat as it is being winched away from the other, along a steel rail. View from below the bow. View from floor showing the two halves of the hull separated. Workers sketch diagram in chalk on floor of drydock. Scaffolding shown in place around the opening between the hull halves. Worker cutting steel plate with acetylene torch. A steel plate affixed to the hull, showing the name, USS Redfin (SSR-272) and the schedule for the project. The only item completed is the start date of May 1st. Workers engaged in fabricating the new section of hull.
CRITICALPAST.COM: About Us | Contact Us | FAQs - How to Order | License Agreement | My Account | My Lightboxes | Shopping Cart | Advanced Search | Featured Collections | Website Terms & Conditions | Privacy Policy | Links ©2024 CriticalPast LLC.
License Agreement |
Terms & Conditions |
Privacy Policy
©2024 CriticalPast LLC.