Step in construction of a Liberty Ship at shipyards in California during World War 2. Cutting floor plates for double bottom assembly. Worker cuts floor plates with a mechanical cutter. Worker in protective helmet and goggles supervises plate cutting. A crane transfers the cut plate to the assembly location. Workers place the floor plate into position on the double bottom. Cranes in the background (Note: May include scenes from Kaiser Shipyard in Richmond, California as well as Hunters Point Naval Shipyard in San Francisco.)
This historic stock footage available in HD video. View pricing below video player.
Type | Size | Price (USD) Comprehensive All Media License |
Price (USD) Digital-Only License |
---|---|---|---|
HD Master, Broadcast-ready (1920x1080, unmarked) | 853 MB | $190.00 | $79.00 |
HD Screener (1920x1080, full-res with timecode) | 853 MB | FREE or $4 (see below) | FREE or $4 (see below) |
Proxy (320x240, low-resolution, watermarked) | 14 MB | FREE or $4 (see below) | FREE or $4 (see below) |