Germany ten years after World War II. Construction of a bridge on the Rhine River in Wiesbaden, Germany.Men heat rivets. An air hammer is used in riveting. A worker rakes a red hot rivet from the fire with a pair of tongs. He places it on the ground to clean it. Men place a large girder into position using a crane. A man uses an acetylene torch for cutting. A man uses a drill. A forge is used to heat the rivets. A worker changes an automatic wrench. Piers to which the bridge will be connected. Men work around.
This historic stock footage available in HD video. View pricing below video player.
Type | Size | Price (USD) Comprehensive All Media License |
Price (USD) Digital-Only License |
---|---|---|---|
HD Master, Broadcast-ready (1920x1080, unmarked) | 1565 MB | $195.00 | $79.00 |
HD Screener (1920x1080, full-res with timecode) | 1565 MB | FREE or $4 (see below) | FREE or $4 (see below) |
Proxy (320x240, low-resolution, watermarked) | 25 MB | FREE or $4 (see below) | FREE or $4 (see below) |