State Park system in Texas, United States during the Great Depression. Valley, mountains, and a pond in Texas. Big Bend national park. River in the park, man walks besides it. Map of Texas. Terrain of the park. Man sits at a CCC camp. Mountains and a valley. Casa Grande Peak in Big Bend National Park, West Texas. Civilian Conservation Corps (CCC) boys engaged in construction work. Men engaged in ranching. Herd of sheep. The Grand Canyon, Chisos mountains, Chisos mountain ranges and boot canyon.
Image of Count Zeppelin's commission, from Provost Marshal General's office, Army of the Potomac, March 21,1863. Count Zeppelin posing with fellow officers behind a Union Army field piece. Zeppelin's hand made model of a rigid dirigible. Count Zeppelin visiting floating hangar where his first rigid dirigible is assembled, on Lake Constance, Friedrichshaffen,Germany. Count Zeppelin at controls looks out of rigid dirigible LZ1, as it attempts first flight , July 2, 1900, over Lake Constance (Bodensee). Scenes of LZ1 ascending.
The airship LZ13 "Hansa," in July 1912, being backed out of her hangar in Hamburg and readied for flight by ground crews . Count Ferdinand Von Zeppelin seen with an officer of the crew, in the passenger compartment (called the "Coupé") of the LZ-13. View of the crowds below waving to the Count. A separate sequence, from June , 1909, shows the damaged airship, LZ 5, after she hit a pear tree near Göppingen, on the return leg of a flight from Lake Constance (Bodensee) to Bitterfeld and back.
Directors of the zeppelin Airship Building Company (Luftschiffbau Zeppelin GmBH) in Germany. Commander Hugo Eckener seated in a chair and holds a cigar in his mouth while reading a paper. Dr. Ing Arenstein, engineer of zeppelin, works at a workshop. Dr. Ludwig Durr writes at desk and drink beverage.
The construction of USS Los Angeles rigid airship by Zeppelin company in Friedrichshafen, Germany. The ship was made at the request of U.S. Navy Department. The chief component being used is duraluminum. Animation depicts the methods of duraluminum stampings and assembly of girders. The workers work at a workshop. Construction and erection of a frame ring. Animated model shows construction of nose and tail. Men carry assembled tail section frame and attach it to the rest of the skeleton.
The construction of USS Los Angeles (ZR-3), LZ-126, rigid airship by Zeppelin company in Friedrichshafen, Germany. The finished skeleton of the airship shows bottom of frame gondolas and oil tanks. Men work on the ship. Men mount engine on a gondola. They attach fabric to framework. Men on ladders work on bow and tail. A man manipulates the elevator controls. Interior of ZR-3 before installing gas balloonettes. Interior of a catwalk. Main passageway of the gondola. Navigating bridge and controls. Radio instruments in communication center.
CRITICALPAST.COM: About Us | Contact Us | FAQs - How to Order | License Agreement | My Account | My Lightboxes | Shopping Cart | Advanced Search | Featured Collections | Website Terms & Conditions | Privacy Policy ©2026 CriticalPast LLC.
License Agreement |
Terms & Conditions |
Privacy Policy
©2026 CriticalPast LLC.